EasyManua.ls Logo

Suzuki GSX-R600 - Page 586

Suzuki GSX-R600
653 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6B-3 Steering / Handlebar:
Installation
Install the handlebars in the reverse order of removal.
Pay attention to the following points:
Install the handlebars temporarily.
Install the upper bracket (1), washer (2) and steering
stem head nut (3) temporarily.
NOTE
Pay attention to the direction of the washer.
Insert the protrusion “A” of the handlebars into the
hole “B” of the steering stem upper bracket.
Tighten the front fork upper clamp bolts (4) and
handlebar clamp bolts (5) to the specified torque.
Tightening torque
Front fork upper clamp bolt (a): 23 N·m (2.3 kgf-
m, 16.5 lb-ft)
Handlebar clamp bolt (b): 23 N·m (2.3 kgf-m, 16.5
lb-ft)
Tighten the steering stem head nut (6) to the specified
torque.
Tightening torque
Steering stem head nut (c): 90 N·m (9.0 kgf-m,
65.0 lb-ft)
Install the front brake master cylinder. Refer to “Front
Brake Master Cylinder Assembly Removal and
Installation in Section 4A (Page 4A-11)”.
Apply grease to the end of the throttle cables and
cable pulley.
: Grease 99000–25010 (SUZUKI SUPER
GREASE A or equivalent)
1
2
3
2
3
I837H1620036-01
“A”
“B”
I837H1620006-01
(a)
4
(a)
4
(b)
5
(b)
5
I837H1620007-02
(c)
6
I837H1620037-01

Table of Contents

Other manuals for Suzuki GSX-R600

Related product manuals