EasyManua.ls Logo

Sym PA12B - Page 86

Sym PA12B
231 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
To this chapter contents
5. AC Generator / Starter Clutch
5-5
ACG stator inspection
Check the following circuit for electricity
conductivity.
Yellow ~ Pink 0.9±10%
Black/White ~ Grounding 420±10%
Green/White ~ Blue/White 105±10%
Light Green/ Red (for the neutral gear sensor)
ACG Stator assembly
Assemble the ACG stator holding screws.
(Screw×2)
Assemble the stator wire correctly onto the
L-crankcase cover with the rubber seal.
Insert the dowel pin, set the L crankcase cover
gasket to the correct position.
Assemble the L crankcase cover (Bolt×9).
Green/White
Yellow
Rubber seal
Light Green/ Red
Black/ red
Blue/White
Pink
Bolt×9

Table of Contents

Related product manuals