EasyManua.ls Logo

Tait TP9100 - Chapter 6: Servicing Procedures; Initial Servicing Tasks

Tait TP9100
326 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TP9100 Service Manual Servicing Procedures 127
© Tait Electronics Limited May 2005
6 Servicing Procedures
Scope of Section This section gives the full sequence of tasks required when servicing a
particular radio. These tasks are:
initial administration, visual inspection and fault diagnosis
repair, final inspection, test and administration
For disassembly and reassembly instructions, refer to “Disassembly and
Reassembly” on page 123.
6.1 Initial Tasks
List of Tasks The following tasks need to be carried out for all radios:
initial administration
visual inspection
powering up the radio
reading the programming file
obtaining the details of the Software Feature Enabler (SFE)
reading the calibration file
checking the user interface
checking any error messages
The following tasks only need to be carried out if they relate to the fault
reported:
checking the transmit and transmit-audio functions
checking the receive and receive-audio functions
Important Observe the “General Information” on page 79.
Tas k 1
Initial
Administration
When a radio is received for repair, details of the Customer and the fault will
be recorded in a fault database. The fault reported by the Customer might
concern damage to or loss of a mechanical part, or the failure of a function
of the radio, or both.

Table of Contents

Other manuals for Tait TP9100

Related product manuals