1-7
GEAR PUMP 1.2
Start up Procedure
1 Mount the gear pump to the loader. (fig. C2353)
2 Connect the hydraulic lines. Torque fittings and lines
according to the torque chart section 1.8.
3 Start the pump and run for 3 minutes each @
a. Half speed at zero flow
b. Half speed, intermittently loaded to 500 psi (35
bar)
c. Full speed, intermittently loaded to 1000 psi (69
bar)
4 Check for leaks.
5 Check flow and pressure at rated speed as outlined in
section 1.3.
C2352
Intermittently load the gear pump at start up
Flow test meter p / n 960456
WARNING
Use caution when dealing with fluid under
pressure. Escaping fluid under pressure can
penetrate the skin and cause serious injury. Never
use your hands to check for system leaks.
C2353
Screws
Hyd. lines
IMPORTANT
Be sure the hydraulic oil reservoir is at the proper
level before performing test.