EasyManua.ls Logo

Toshiba e-studio205L - Adjustment of Developer Unit

Toshiba e-studio205L
672 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
e-STUDIO205L/255/305/355/455 © 2009 TOSHIBA TEC CORPORATION All rights reserved
ADJUSTMENT
3 - 58
3.11 Adjustment of Developer Unit
3.11.1 Doctor-to-sleeve gap
Adjustment tool to use: Doctor-sleeve jig
<Procedure>
(1) Perform the adjustment code “05-280”.
(2) Take out the process unit from the equipment.
(3) Take out the developer unit from the process unit.
(4) Remove 2 screws and take off the developer
material cover and discharge the developer
material.
Note:
Discharge the developer material from the
rear side, being careful not to let it be
scattered on the gear.
Fig. 3-49
(5) Turn the adjustment screw to widen the gap
so that the jig can be inserted in it.
(Turning the screw clockwise widens the
gap)
Fig. 3-50
Developer
material cover
Screw

Table of Contents

Related product manuals