EasyManua.ls Logo

Trane TCONT900AC43UA - Page 150

Trane TCONT900AC43UA
336 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GF - C 2
Pressure Switches
Pressure switch testing
Step 1
Connect a slope gauge or magnehelic gauge to the
recoup cell cold header and the burner box fittings
using field supplied tees and hoses (Figure 1.)
Step 2
Connect an AC volt meter to the pressure switch be-
ing tested. Connect the meter leads to the pressure
switch terminals (Figure 2.) The AC voltmeter should
read 24 volts AC. If the 24 volts A/C is present at the
switch, go to Step 4. If the 24 volts AC is not read, go
to Step 3.
Figure 1
Figure 2
Step 3
Check for 24 Volts AC coming to the pressure switch,
see drawing # 3. Connect one lead of the AC Volt
Meter to the B/C terminal of the gas furnace low volt-
age terminal board and the other AC Volt Meter lead
will be connected to one pressure switch terminal (one
at a time) to see if 24 Volts AC is being supplied to
the pressure switch (Figure 3.)
If 24 Volts AC is present at both pressure switch ter-
minals, the pressure switch is closed and it must be
replaced. Check the following furnace’s components
if 24 Volts AC is not being supplied to the pressure
switch; 5 amp fuse, transformer, wiring and the fur-
nace IFC.
Figure 3

Table of Contents

Other manuals for Trane TCONT900AC43UA

Related product manuals