EasyManua.ls Logo

transnorm TS 1300 - Transportation and Installation; Delivery of the Machine; Unpacking the Machine; Long-Term Machine Storage

Default Icon
90 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Transportation and installation
Delivery of the machine
35
Transportation and installation
Delivery of the machine
Machines up to a length of approx. 4 m are completely assembled at the
factory and are pre-configured upon delivery. Longer machines are usually
delivered in part components. The individual parts are marked with labels on
the section points. Supports, suspensions and other attachments are packed
separately and included in the delivery.
Unpacking the machine
Complete the following steps:
1. Remove all transport packaging.
2. Check for possible transport damage.
3. Check that all items listed on the delivery note have been delivered.
Machine has been unpacked and is complete.
Long-term machine storage
If the machine is to be stored for more than four weeks, the conveyor belt
must be slackened off in order to prevent damage caused by bulging. The
procedure for slackening off the belt is described in the maintenance and
repair section. If the machine is transported by sea, seaworthy packaging will
be additionally required.
Observe the permitted operating conditions described in the following for
machine storage also.
If you have any queries concerning storage and transport, please contact
TRANSNORM SYSTEM GmbH.

Table of Contents

Related product manuals