EasyManua.ls Logo

transnorm TS 1300 - Operation; Commissioning; Commissioning and Start-Up after Service and Maintenance Work

Default Icon
90 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation
Commissioning
47
Operation
Commissioning
The procedures for commissioning and start-up after servicing and mainte-
nance work are to a large extent identical.
The daily start-up process via the control unit of the overall conveyor system
is described in the system documentation or in the control documentation.
The machine is designed for the following electrical connection data:
3 phases, neutral conductor and earthing conductor
Alternating voltage 400 V
Mains frequency 50 Hz.
Commissioning and start-up after service and
maintenance work
Requirements:
Machine has been installed appropriately.
The working area of the machine is inaccessible for unauthorised
personnel.
The main switch for the power supply to the machine is turned off and
has been secured against accidental switch-on.
Machine has not been out of operation for longer than 4 weeks.

Table of Contents

Related product manuals