Operation
Commissioning and start-up after service and maintenance work
48
Operating instructions: Indexing conveyor/short track conveyor TS 1300
Version 3.6ENG, 28.02.2019
Check installation
Complete the following steps:
1. Check the position of all pulleys and rollers.
2. Check that drive elements are correctly fitted, aligned and tensioned.
3. Check the machine for foreign objects and remove them if necessary.
Installation has been checked.
Carry out electrical
installation
DANGER
Risk of fatal injury from electric shock!
The machine is supplied with 3-phase alternating current.
The electrical installation is to be carried out by qualified and authorised
electrical technicians only.
Complete the following steps:
1. Install all required cables.
2. Attach required plugs to all cable ends.
3. Attach cables and fit all required connections in compliance with the
manual of the motor manufacturer (please refer to electrical installation
section in the documents enclosed).
The machine has been connected.