EasyManua.ls Logo

Tuttnauer TIVA2 - Page 35

Tuttnauer TIVA2
80 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
35
Installation
1
2
Fig. 10 - Spray arms
1) Upper spray arm. - 2) Lower spray arm.
- After xing the spray arms, carry out a test by manually
turning it, making sure that they rotate freely and with-
out impediments.
- After machine positioning, make sure nothing is pre-
venting the tank door from being freely opened.
- Make sure the machine is connected properly to the
electrical supply, to the water supply and to the drain
trap, then level it by adjusting its feet.
- After installation remove the PVC protection layer cov-
ering the panels, make sure the liquid tanks are full and
the suction nozzles are properly inserted into the right
tanks. A label next to the cap indicates the type of liquid
to be used for each suction tube.

Related product manuals