Installation 8
2 Installation
The installation process consists of the following procedures, namely:
• Pre-installation
• Installation Preparation
• Mechanical Installation
• Electrical Installation
2.1. Pre-installation
2.1.1. Transportation and Movement
Railways and shipping are the preferable transport options for the AHU. If transport by rail or by ship is unavailable, transport
by road is recommended. When selecting road transport, roads without too many bumps are highly recommended.
AHU is heavy, using mechanical equipment like an electrical forklift to move the unit is recommended.
Move the equipment to the location near the installation site.
If an electric forklift is used, Figure 2-1 shows how the forklift tines are inserted underneath the pallet and shown in the same
picture below the illustration to the right that the lines should be aligned with the center of gravity to prevent the equipment
from falling.
Figure 2-1 Moving an Equipment Using a Forklift Truck