Vertiv™ | Liebert® AHU | User Manual 9
When the forklift is used, please lift the unit from both ends and ensure that the distance of the unit from the floor is no
more than 51 mm-102 mm. All personnel standing next to the unit must be 3.7 m away from the unit for safety reasons. If the
unit will be lifted more than 102 mm in height, the personnel standing next to the unit shall be more than 5 m away from the
unit for safety. When the unit is transported by forklift, it should be ensured that the unit is stable to avoid tipping due to an
excessive inclination angle.
2.1.2. Unpacking
Move the equipment to the nearest location of the final installation site and unpack it. Follow the procedures below for
unpacking:
1. Remove the EPE and the Top Support
First remove the stretch film and plastic bag. Then remove the EPE protective cover, corner protector, and cushion. For
better understanding see Figure 2-2.
No. Description No. Description
1 Protective Cover 3 Cushion
2 Corner Guard 4 Top Support
Figure 2-2 Removal of the EPE and the Top Support
2. Remove the Base Pallet
The unit is fixed onto the base pallet with an M8×40 bolts screw, as shown in Figure 2-3. Use a 17 mm open-end spanner,
ratchet spanner, or sleeve to remove the fixing bolts.