Voltwerk VS 3, 4, 5 Operating manual 37
5 Installation
ENGLISH
DO_BA_2008_121LB_3ENG_BVo 22.2.10
2. Tighten the cable connection. Make sure that the cable is
firmly seated.
3. Repeat the procedure for the second cable.
4. Push the connector socket and connector plug onto the
string inverter's DC+ plug and DC– socket (see Figure 3.1,
page 16, item (1), (2)).
Result The solar power system cable is connected.