EasyManua.ls Logo

VOLTWERK VS 3 - Page 88

Default Icon
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Voltwerk VS 3, 4, 5 Operating manual 25
4 Transportation and assembly
ENGLISH
DO_BA_2008_121LB_3ENG_BVo 22.2.10
4.2.2 Wall mounting
Property damage due to incorrect storage.
LED indicators are not flush-mounted and may break under
load.
| Store inverters on their sides or rear sides only.
Requirements
| Installation instructions have been followed.
Make sure that no devices that generate warm exhaust air
are installed above or below the inverter.
A lack of clearance between the devices may reduce
output.
Required tools and materials
| String inverter (included in the delivery)
| Wall bracket (included in the delivery)
| Drilling template (included in the delivery)
|Plugs and screws (included in the delivery)
| Suitable drill
| Suitable open-ended spanner
Fitting the inverter
1. Remove the inverter from its packaging. Take care to
ensure that:
| The device hood is packed separately.

Table of Contents