EasyManua.ls Logo

WAGNER SPRINT 2 - Page 4

WAGNER SPRINT 2
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating manual Manual system SPRINT 2
Table of Contents
4 Order number 2467031 | Edition 04/2024
6.4 Assembly of the manual system 21
6.4.1 Assembly of the mobile base 21
6.4.2 Connecting the manual system 23
6.5 Grounding 34
6.5.1 Grounding the powder coating system 35
6.6 35
7 36
7.1 36
7.2
Safety checks
Operation
Training the operating personnel
Tasks
36
7.2.1
Switching on the manual s
ystem 36
7.2.2 Setting the fluidization of Sprint 2 B (box) 37
7.2.3 Setting the fluidization of Sprint 2 H (60 L tank) 38
7.3 Factory setting recipe nos. 1–4 39
7.4 Interrupting the coating process of Sprint 2 B (box) 40
7.5 Interrupting the coating process of Sprint 2 H (60 L tank) 41
7.6 Performing a paint change 41
7.6.1 Box version 41
7.6.2 60 L tank version 42
8 Cleaning and maintenance 44
8.1 Cleaning 44
8.1.1
Cleaning p
ersonnel 44
8.1.2 Flushing and cleaning the system 44
8.2 Maintenance 44
8.2.1
Maintenance personnel
44
8.2.2
Maintenance i
nstructions 44
8.2.3
Safety checks
45
8.2.4
Maintenance procedures
45
8.3 Periodic checking of the manual system 45
8.3.1 Sprint 2 B version (box) 45
8.3.2 46
9 48
10
Sprint 2 H version (60 L tank)
Troubleshooting and rectification
Inspections i
n accordance with DIN EN 50050-2: 2013
49
10.1 Abbreviations 49
10.2 50
11
Overview t
able
Disassembly and disposal
51
11.1 Disassembly 51
11.2 Disposal 51
12 Accessories 52
12.1 PEM-T3 manual gun 52
12.2 52
13
PEM-T3 e
xtension
Spare parts
53
13.1 How to order spare parts 53
13.2
Notes on the u
se of spare parts 53
13.3 Spare parts list for Sprint 2 B manual system 54
13.4 Spare parts list for Sprint 2 H manual system 55
13.5 Mobile base 56
13.6 Vibration table 56
13.7 Swivel arm set 57
13.8 60 L/25 L tank 58

Table of Contents

Related product manuals