EasyManua.ls Logo

Watson-Marlow 505LA - General Operation

Watson-Marlow 505LA
525 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13 General operation
Opening the pumphead guard
l Isolate the pump from the mains power supply.
l Disconnect the tubing from the external pipework.
l Lift the two levers at either side of the pumphead and remove the track.
l Follow the reverse of the installation process above to remove the tubing from the pumphead.
Pre-load checks
l Before loading tubing, ensure that all rollers rotate freely, that the tube ports and location grooves
are clean
Closing the pumphead guard and start-up
Ensure no debris, loose fastenings or other foreign objects are in
pumphead before start-up. Failure to do so may result in an explosion
hazard.
PB0379:m-505atex-en-04 23

Table of Contents