EasyManua.ls Logo

WEG CFW-11 - Start-Up Procedure

WEG CFW-11
116 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
First Time Power-Up and Start-Up
5
5-2 | CFW-11
6. Measure the power supply voltage and verify if it is within the allowed range, according to the Chapter 8
TECHNICAL SPECIFICATIONS on page 8-1.
7. Apply power to the input:
Close the input disconnect switch.
8. Check the result of the first time power-up:
The keypad should display the standard monitoring mode (Figure 4.3 on page 4-4), and the status LED
should be steady green.
5.2 START-UP
The start-up procedure for the V/f is described in three simple steps by using the Oriented Start-up routine
and the Basic Application group.
Steps:
1. Set the password for parameter modification.
2. Execute the Oriented Start-up routine.
3. Set the parameters of the Basic Application group.

Table of Contents

Other manuals for WEG CFW-11

Related product manuals