Testing
Continuity
There should not be any continuity between these two wind-
ing groups. Test between terminal #3
and
tenninal #6.
If
con-
tinuity exists, there is a short in the windings.
There also should be no continuity between the terminals and
the generator case (ground).
MAIN
STATOR
WINDING
LEADS
TESTING
CONTINUITY
BETWEEN
THE
TWO
WINDING
GROUPS
TESTING
CONTINUITY
EACH
TERMINAL
TO
CASE
GROUND