STARTING THE APPLIANCE
Selecting Service Menus:
14 Press and hold and buttons
together for 1 second, the display will
show Menu 1.
Double up or down arrows indicate that the
menu can only be scrolled up or down.
An up and down arrow indicates position in
the menu where options can be scrolled either
up or down.
24 Scroll up and down
through the menus with
the arrow buttons.
Menu 2 - Boiler parameters:
34Select Menu 2 via the and arrow
buttons.
4Press and hold the OK button, for 1
second to enter Menu 2.
The menu lists the boiler parameters, which can
be adjusted in this menu.
To modify setting:
44Select the desired menu option using the
arrow buttons (refer to the table below) and
press the OK button, the option will flash.
4Adjust the parameter using the up and
down arrow buttons and press the OK
button to confirm.
A tick will appear on the display for 3
seconds to confirm the update of the new
value.
The same process is used for adjusting Menus
1 & 2.
1
2
3
4
2.7A Demand /fault indicator
(blue light) activation
0 = The blue light will
only operate as a
flashing fault alert.
1 = The blue light will
operate as a boiler
demand light and fault
alert.
This is set to 1 by default.
Menu 2 parameter.
STARTING THE APPLIANCE
INSTALLATION & SERVICING INSTRUCTIONS FOR GREENSTAR HEATSLAVE II EXTERNAL 12/18-18/25-25/32
6 720 805 210-01
41
COMMISSIONING