8
2. PRE-OPERATION PROCEDURES
Installation Procedures
15. Close the drain valve.
Be sure drain valve is closed prior to operation.
Forgetting to close this valve or leaving it
partially open will cause water to leak from
chamber, resulting in equipment damage from
overheating or fire.
16. Fill drain bottle to proper level.
Fill the drain bottle with 1500cc of water to
cool the steaming hot water that is
pressure drained from the chamber into
the drain bottle before unit enters the
sterilization and drying process. Do not
overfill the bottle or it may overflow and
cause a short circuit or fire, resulting in
equipment damage and/or serious injury.
Observe the 1500cc fill limit.
OPEN