2. PRE-OPERATION PROCEDURES
Installation Procedures
18. Add water to chamber.
Using the heater baffle as a gauge, add water to
the chamber.
An inadequate amount of water will result in
sterilization process interruption. Confirm water
level before each operation run and be sure to
add water before level reaches the lower limit.
SEE TABLE ON RIGHT FOR CHAMBER
WATER CAPACITIES. USING MORE THAN
THE MAXIMUM CAPACITY WILL RESULT
IN HOT WATER OVERFLOWING FROM
THE DRAIN BOTTLE.
Requirement
SM201
19002000ml
SM301
28003000ml
SM311
28003000ml
SM501
28003000ml
SM511
28003000ml
19. Use distilled water in chamber
Well water and tap water is not recommended. To prevent mineral deposits from forming and to
protect chamber components from corrosion, use distilled water in the chamber.
20. Place sterilization load in chamber.
Place process load into basket and insert
basket into chamber. Do not block the exhaust
port. Always use basket for process load.
21. Close front panel door before operation.
Be sure that the front panel door of sterilizer is closed before operation. If door is left open, the drain
bottle may fall out and spill, possibly causing a short circuit or fire, resulting in equipment damage
and/or injury. Likewise, do not open the front panel door during operation.
Upper Limit
Lower Limit
Exhaust Port