EasyManua.ls Logo

York YZ MODEL A - FIGURE 27 - Sales Order Screen

York YZ MODEL A
170 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
JOHNSON CONTROLS
70
FORM 161.01-OM1
ISSUE DATE: 6/8/2018
SECTION 3 - OPTIVIEW™ CONTROL CENTER FUNCTIONS AND NAVIGATION
FIGURE 27 - SALES ORDER SCREEN
LD26748
DISPLAY ONLY FIELDS
DISPLAY ONLY FIELDS
FIELD/LED NAME DESCRIPTION
Commissioning Date Dene the date at which the chiller was commissioned.
Job Name and Location Factory dened job name and location the chiller is destined for.
Model Number Factory dened model number of the chiller system.
YORK Order Number Factory dened order number under which the chiller was sold.
Panel Serial Number Factory dened serial number for the control panel.
Chiller Serial Number Factory dened serial number for the chiller system.
Evaporator and Condenser Passes Factory dened number of passes.
Evaporator and Condenser Water Box
Press
Factory dened Water Box Pressure rating.
Evaporator and Condenser Pressure
Drop
Factory dened Pressure drop across the shell.
Evap and Cond Nozzle Arrangement In Factory dened inlet nozzle arrangements.
Evap and Cond Leaving Liquid Factory dened design Leaving Liquid Temperature.
Evap and Cond Entering Liquid Factory dened design Entering Liquid Temperature.
Evap and Cond Flow Factory dened design Flow Rates
Evap and Cond Tube Code Factory dened Tube Codes.
Motor Code Factory dened Motor Code.
This screen displays the sales order parameters. The
Commissioning date is entered by the YORK/Johnson
Controls Service Technician at the time of chiller com-
missioning. These values should never be changed or
entered by anyone other than a qualified Service Tech-
nician. The remainder of the values are entered at the
YORK Factory during the manufacturing of the chiller.

Table of Contents

Related product manuals