ZXR108900SeriesHardwareInstallationManual
thecircuitisanopencircuit.Iftheresultshowsthatitisnot
anopencircuit,thenthecabinetisnotinsulatedwithearth.
Examinetheinsulatedtube.Repeatthelaststepandinsula-
tiontest.
Note:
Insulationtesthastobeimplementedimmediatelyaftereach
cabinetfootingisxed.
Result:Cabinethasbeeninstalledbyadjustablebase.
InstallingCabinetonFloorDirectly
Toinstallcabinetonoordirectly,performthefollowingsteps.
1.CabinetHeightRegulation
AsshowninFigure35,loosenthefourboltsthatfastenthe
trucklesandthenremovethetruckles.Loosenthefourlock-
nutsoffooting.Placethecabinetonthecorrespondingposition
oftheedgeexpansionboltonNOCroomoormanuallyorby
liftingmachine.Makesurethattheright,left,frontandback
planeofcabinetareparallelwiththeNOCroomwalls.Usethe
heightadjustingnutonfootingtoregulatetheheightofcabi-
net.
Afterinstallingthepanelwood,thereis5mmclearancebe-
tweenthebottomofpanelwoodandoor ,asshowninFigure
35.
FIGURE35THECLEARANCEBETWEENPANELWOODANDFLOOR
1.Cabinet
2.PanelWood
3.Floor
2.CabinetLeveling
Thecabinetmustbeverticallyinstalled.Placelevelbaron
thetwoperpendiculardirectionsofcabinettoppanel.Usethe
heightadjustingnuttoregulatethehorizontalityandvertical-
ityofcabinet.Installedhorizontalityandverticalitydeviation
42CondentialandProprietaryInformationofZTECORPORATION