EasyManua.ls Logo

Zte ZXR10 8900 Series - Figure 36 Cabinet Base Is Installed on Floor Directly

Zte ZXR10 8900 Series
109 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter419ā€StandardCabinetInstallation
mustnotexceed3mm.Fastenthelocknutupwardtoxthe
cabinetfooting.Thefasteningtorquehastoreach45Nm.
3.CabinetFixation
AsshowninF
igure36,pressthepressureplateonthecabinet
footingandplacetheinsulatedtubeonexpansionbolt.At
lastxthecabinetwithatwasher ,springwasherandblot.
Thefasteningtorquehastoreach45Nm.Thepressureplate
isattachedwithaninsulatedrubberpad.Pressureplateand
insulatedpadareshowninFigure36.
FIGURE36CABINETBASEISINSTALLEDONFLOORDIRECTLY
1.FlatWasher
2.InsulatedTube
3.Cabinet
4.NutM12
5.SpringWasher
6.PressurePlate
7.Footing
8.ExpansionBolt
4.InsulationTest
Modifythemultimetertoresistancegrade.Usethetwomea-
suringheadstotouchthecabinetearthingpointandexpansion
bolt.Measuretheirresistance.Continuethenextstepifthe
circuitisanopencircuit.Iftheresultshowsthatitisnotan
opencircuit,thenthecabinetisnotinsulatedwithearth.Ex-
aminetheinsulatedtube.Repeatthelaststepandinsulation
test.
CondentialandProprietaryInformationofZTECORPORATION43

Table of Contents

Other manuals for Zte ZXR10 8900 Series

Related product manuals