ZXR108900SeriesHardwareInstallationManual
Note:
Insulationtesthastobeimplementedimmediatelyaftereach
cabinetfootingisīæxed.
Result:Cabinethasbeeninstalledonīoordirectly.
InstallingCabinetbyFixedBase
Whencabinetbottomisinstalledbyaīæxedbase,thecabinetcan
beīæxedbytwomethods.
ļæ½Fixcabinetbypressureplate
ļæ½FixCabinetbylocknuts
Takecabinet19D8H20asanexampletodescribehowtoinstall.
FixCabinetby
PressurePlate
Toīæxcabinetbyusingpressureplate,performthefollowingsteps.
1.CabinetHeightRegulation
Therearefourfootingsandtrucklesonthecabinetbase.
Loosenthefourboltsthatfastenthetruckles,asshownin
Figure37.Removefourtruckles.Placethecabinetonthe
installationbasemanuallyorbyliftingmachine.Makesure
thattheright,left,frontandbackplaneofcabinetareparallel
withtheNOCroomwalls.Usetheheightadjustingnuton
footingtoregulatetheheightofcabinet.
FIGURE37REMOVETRUCKLES
1.Cabinet
2.Footing
3.Truckle
4.Bolt
2.CabinetLeveling
44ConīædentialandProprietaryInformationofZTECORPORATION