ABB Switzerland Ltd 1KHW001495-EN
Archive No.: Rev. Date:
Commissioning Instructions ETL600 Rel.1
- A 05-11-16
Responsible Department: Prepared: Approved: Distribution: Lang.: Page:
PTUKT 2005-09-13 H. Benninger 2005-11-16 C. Leeb - EN 1/28
Valid for: Derived from: Replaces: Classification-No.: File:
- 1KHL015944-EN - - 1KHW001495ae Commissioning
Instructions ETL600 Rel1.doc
Powerline Carrier Equipment: Series ETL600
Commissioning Instructions ETL600 Rel.1
This document describes programming and testing of powerline carrier equipment ETL640 and ETL680,
including the teleprotection system NSD600.
Contents
C Commissioning Instructions for the ETL600 Rel.1 Equipment 3
C.1 General 3
C.2 Power supply for channel rack P7LA 4
C.3 Connect to equipment, upload configuration 4
C.4 Change configuration, if necessary 4
C.5 Transmitter 5
C.6 Receiver 5
C.7 Equalization 8
C.8 Testing of R1BC, if present 9
C.9 Configure Real Time Clock (RTC) 9
C.10 Testing of NSD600 with interface G4AI, if present 10
C.11 Testing of O4LE, if present 11
C.12 V.11 ports 14
C.13 V.24 ports 14
C.14 Documentation 15
C.15 Manual reset 15
Sheet ETL600 System Test report ....................................................................... C1 - C10
Test conditions:
Temperature range: 10 °C to 40 °C.
The connections for the tests can be made either at the test sockets on the front of the
equipment or at the terminals.
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to
third parties without express authority is strictly forbidden. © ABB Switzerland Ltd

Table of Contents

Related product manuals