8 Trouble Shooting
8.5 LED Indicator Panel
202 3HNA009834-001 en Rev.06 Product Manual, Control Cabinet IRC5P
Enable PIB
Green - Enable signal from PIB OK
Blinking Green/Red - Software
deactive and
Enable Chain - HW OK.
Blinking Red during start up -
Waiting for loading of FPGA.
Off - Enable signal lost
Blinking Red - Failure
Check communication cable from PIB to Main
Computer.
Check communication cable to SIB and MIB.
Enable SIB
Green - Enable signal from PIB
OK. Communication between SIB
and PIB is OK.
Off - Communication lost.
Blinking Red - Failure
Check communication cable from SIB to PIB.
Check Power LED on SIB.
Enable MIB
Green - Communication between
MIB and SIB is OK (MIB OK).
Off - Communication lost.
Blinking Red - Failure
Check communication cable from MIB to SIB.
Check Power LED on MIB.
Enable Manipulator 1
Green - OK. MCOB is operative.
Blinking Red - Failure, MCOB not
ready.
Indicator lights red during purging
sequence.
Enable signal from MCOB or robot temp. sensor chain.
Check Temp. Motors LED.
If used, check working area limit switches for
manipulator axes, wiring and connectors.
If used, check collision protection, wiring and
connectors.
Enable Manipulator 2
Same as Enable Manipulator 1 but
for 2nd manipulator such as CBS.
2 Ch. Monitoring
Green - OK.
Blinking Red - Failure, divergency
in switches and/or relays in safety
chain.
Check Run Chain LEDs for divergency.
Check safety chain switches and relays for malfunction.
Check wiring and connections for Emy Stop buttons.
Safety element not tested after divergency failure.
Power Status
Green - OK.
Blinking Green - Low voltage on
measuring system battery.
Blinking Red - One or more supply
voltages faulty, e.g. emy stop chain
supply.
If LED is blinking green,
Replace the battery.
If LED is blinking red,
Check 24V supply to PDB.
Check PDB power status LEDs
Check Purging status.
Check Fuses for rectifier (DC Link).
Emy stop chain supply.
Temp Cabinet
Green - OK.
Blinking Red - Temperature in
control cabinet or transformer too
high.
Check cause of increased temperature in cabinet. Take
necessary measures to reduce temperature. (By
excessive ambient temperature cooler may be
installed).
Check PTC on mains transformer and wiring.
Enable Chain Closed
Green - OK. Enable chain is active.
Blinking Red - Chain is not active.
The ‘Enable Chain Closed’ LED indicates that all elements
in the enable chain are active.
Check that all SYSTEM LEDs above the ‘Enable Chain.
Closed’ LED are OK. If not, correct error as required.
Description Source of fault / Remedy

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB IRC5P and is the answer not in the manual?

ABB IRC5P Specifications

General IconGeneral
BrandABB
ModelIRC5P
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals