IEC17000044 V1 EN-US
Figure 221: Merging unit
19.3.2 Setting guidelines
GUID-3449AB24-8C9D-4D9A-BD46-5DDF59A0F8E3 v1
For information on the merging unit setting guidelines, see section
IEC/UCA
61850-9-2LE communication protocol.
19.4 Routes
19.4.1
Application
GUID-19616AC4-0FFD-4FF4-9198-5E33938E5ABD v1
Setting up a route enables communication to a device that is located in another
subnetwork. Routing is used when the destination device is not in the same subnetwork
as the default gateway.
The route specifies that when a package is sent to the destination device it should be
sent through the selected router. If no route is specified the source device will not find
the destination device.
19.4.2 Setting guidelines
GUID-2C4A312A-00DC-44C8-B2D9-CD0822E1C806 v1
Routes are configured using the Ethernet configuration tool in PCM600.
Operation for the route can be set to On/Off by checking and unchecking the check-
box in the operation column.
Gateway specifies the address of the gateway.
1MRK 511 401-UUS A Section 19
Ethernet-based communication
Bay control REC670 2.2 ANSI 575
Application manual