Event ID Audit trail event Description
6120 Test off Test mode ended
6130 Control operation Control operation performed successfully
5120 Reset trips Latched trips reset
PCM600 Event Viewer can be used to view the audit trail events and process
related events. Audit trail events are visible through dedicated Security events
view. Since only the administrator has the right to read audit trail, authorization
must be used in PCM600. The audit trail cannot be reset, but PCM600 Event
Viewer can filter data.
3.4 Station communication
Operational information and controls are available through a wide range of
communication protocols including IEC 61850 and Modbus
®
. Full communication
capabilities, for example, horizontal communication between the relays, are only
enabled by IEC 61850.
The IEC 61850 protocol is a core part of the relay as the protection and control
application is fully based on standard modelling. The relay supports Edition 2
version of the standard. With Edition 2 support, the relay has the latest
functionality modelling for substation applications and the best interoperability for
modern substations.
3.5 PCM600
Protection and Control IED Manager PCM600 offers all the necessary functionality
to work throughout all stages of the protection relay's life cycle.
Planning
Engineering
Commissioning
Operation and disturbance handling
Functional analysis
The whole substation configuration can be controlled and different tasks and
functions can be performed with the individual tool components. PCM600 can
operate with many different topologies, depending on the project needs.
For more information, see the PCM600 documentation.
2NGA000823 A Section 3
REX610 overview
REX610 23
Operation Manual