EasyManua.ls Logo

Acer AOHAPPY2 - Page 96

Acer AOHAPPY2
404 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-16 Machine Maintenance Procedures
2. Install the hard drive into the hard drive compartment. Refer to Figure 3-11.
3. Connect the hard drive cable (A) to the mainboard connector (B). Refer to
Figure 3-10.
4. Install the base cover.

Table of Contents

Related product manuals