IST Series UPS (10kVA-200kVA)
User Manual 4 Touch Screen
67
Figure4-45 Charge setting 3
4.6.3 Battery Test
In setting management page, click battery test icon , it will enter battery test page, as
shown in Figure4-46.
Figure4-46 Battery test
4.6.4 Function Configuration
In setting management page, click function configuration icon , it will enter function
configuration page. The page includes generator setting and dedusting setting, and can be
changed by the top button. Click enter box to change the parameter. Click Save button to
save the setting. The mark of setting success and setting failure is the same as that of system
setting.