HI ROLLER - BELT CONVEYORS 8. TROUBLESHOOTING
HI ROLLER, MINI ROLLER, LO ROLLER & HI LIFE
P115506 R3 123
28. Start-up problems. head pulley slippage cleaning system failure, material
build up is causing extreme belt
pull requirements - system must
be cleaned
moisture must be eliminated
29. Tracking. belt is tracking well
empty, but tracking is
to one side when
loaded
loading problems, side flows will
push belt to the side - see Sec-
tion 4.6.
belt misalignment loading problems - bi-directional
loaders require a special design,
contact Hi Roller engineering
loading problems - control gate
not proper installed, see Section
4.6.
loading problems - flow of mate-
rial is not directed down the back-
plate of the loader, see Section
4.6.
loading problems - flow of mate-
rial is not evenly flowing down the
loader back place, see Section
4.6.
loading problems - side flows will
push belt to the side, see Section
4.6.
30. V-plow. splice hitting in tail sec-
tion
the v-plow must be adjusted
properly - see “V-Plow Adjust-
ment” on page 52