1260 Infinity QuatPump VL User Manual 135
Maintenance
9
Exchanging the Optional Interface Board
3 Loosen the screws. Slide out the interface board from the pump.
Figure 10 Exchanging the Interface Board
4 Install the new interface board. Secure screws.
5 Reconnect the cables to the board connector.
6 Reconnect the pump to line power.