EasyManua.ls Logo

Agilent Technologies 1260 Infinity VL - Page 137

Agilent Technologies 1260 Infinity VL
204 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1260 Infinity QuatPump VL User Manual 137
Maintenance
9
Exchanging the Active Inlet Valve (AIV) or its Cartridge
5 Using a 14 mm wrench loosen the active inlet valve and remove the valve
from the pump head.
Figure 11 Active Inlet Valve Assembly
6 Using a pair of tweezers remove the valve cartridge from the actuator
assembly.
7 Before inserting the new valve cartridge clean the area in the actuator
assembly. Flush the cartridge area thoroughly with alcohol.
8 Insert a new cartridge into the actuator assembly (make sure the valve
cartridge is completely inserted into the actuator assembly).
9 Insert the new valve into the pump head. Using the 14 mm wrench turn the
nut until it is hand tight.
10 Position the valve such that the solvent inlet tube connection points
towards the front.
11 Using the 14 mm wrench tighten the nut by turning the valve into its final
position (not more than a quarter turn).
12 Reconnect the adapter at the active inlet valve.
13 Reconnect the solvent inlet tube to the adapter. Reconnect the active inlet
valve cable to the connector in the Z-panel.
14 Reinstall the front cover.
15 Purge the system with 30 mL of solvent in order to achieve a low pressure
ripple, see “Regular Priming” on page 44.
6Xi^kZ^caZikVakZXVgig^Y\Z
6Xi^kZ^caZikVakZ

Table of Contents

Related product manuals