First Startup 2
Installation and First Startup 67
Prepare for Your Method (Optional)
At this point, installation is complete. However, if you have
purchased an optional sample loop, install it now before
continuing. See the Maintenance guide for details.
Also consider your method’s vial pressures and carrier gas
pressures. Make sure that the gas supplies are set to provide
at least 138 kPa (20 psi) higher than the highest pressure
needed (for vial pressurization or for the GC column carrier
flow during temperature programming), up to the maximum
input pressure of 828 kPa (120 psi).