51
5.2 Check Project and Schedules of Maintenance
Please carry out the following necessary inspections, maintenances
and replacements frequently:
Item
Area of Inspections
Frequency
1
Check to make sure functions of the gripper and vacuum suction
headwork (EOAT) are normal?
Daily
2
Draining water from the air filter/regulator assembly?
Daily
3
Tighten connecting screws on the vacuum suction headwork
(EOAT)?
Daily
4
Draining water from the air compressor?
Daily
5
Check if connections between ROBOT and I.M.M., and between
hand-held pendant and control box are well tightened?
Daily
6
Check if there is any part on the ROBOT for loosen
Daily
7
Re-lubricate bearings on the crosswise axis?
Weekly
8
Clean and restore appearance of the ROBOT?
Weekly
9
Re-lubricate slide rail(s) and sliding blocks on the vertical axis?
Monthly
10
Check the pneumatic hose lines and the speed control valves
are of no leakage and normal?
Monthly
11
Check function of the vacuum generator?
Monthly
12
Check if mounting bolts between the base and machine platen are
fully tightened?
Monthly
13
Check function of the shock absorbers?
Monthly
14
Replace the pneumatic hoses, electrical wires and cables
entirely?
3 year

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the alfa robot Phoenix Series and is the answer not in the manual?

alfa robot Phoenix Series Specifications

General IconGeneral
Brandalfa robot
ModelPhoenix Series
CategoryRobotics
LanguageEnglish

Related product manuals