EasyManua.ls Logo

Allsteel Optimize - Ceiling In-Feed Installation into Baserail Area using Integrated Power Pole

Default Icon
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
343-3512A (03/13)
10 of 27
Optimize
Illustration 7: Ceiling In-Feed Installation into Baserail Area using Integrated Power Pole (870071)
Ceiling in-feed
cable 8719(12/18) -
Position power pole
into top of 90°, Tee, or
Cross connectors
Panel support
Use wire tie to secure in-feed cable to panel support
Note: For information regarding installation of
power poles, refer to the appropriate
panel series Power Pole Installation
Instructions.
8 Wire Electrical Installation

Table of Contents

Related product manuals