Installation
MN-39404 • Rev 0 • 05/18 • AR-7T Series Electric Rotisserie Manual 11
Pre-Install Checklist
Rotisserie Pre-Installation Checklist
Location Name: Date:
Location Address: State/Zip Code:
Building Name:
Phone:
Contact Name: E-mail:
Install Company:
Install
Technician:
Contact Info:
Number of Ovens
Being Installed:
Model Number Serial Number
Check all clearances of doors, entryways, and hallways from delivery point to installation area.
Measured door/entryway clearance
Door Door Door 3
Measured hallway clearance
Hall 1 Hall 2 Hall 3
Elevator opening
Door
Elevator internal dimensions
Height Width Depth
Will ovens t through all measured locations?
❑ YES ❑ NO
Oven Unpacked Dimensions:
H W D
Comments: