Installation
 12  MN-39404  •  Rev 0  •  05/18  •  AR-7T Series Electric Rotisserie Manual
Rotisserie Pre-Installation Checklist (continued)
Oven Clearances:
Installation Clearances
Right side:
Rear:
Le  side:
Bottom:
Top:
Comments:
Water Supply:
System needs one (1) cold water line with 3/4" NPT connection. 
Measured rate of  ow:
GPM
Measured water pressure:
PSI BAR
Is the line treated water?
❑ Yes ❑ No
Has a water analysis been completed?
❑ Yes ❑ No
Does water meet minimum quality standards?
❑ Yes ❑ No
Electrical:
Rated oven voltage/phase: Voltage Phase
Actual main voltage provided: Voltage Phase
Actual voltage: 1 PH L1-N L2-N
3 PH L1-N L2-N L3-N
3 PH L1-L2 L1-L3 L2-L3
Breaker Size:
Left side 11" (279mm) 
Rear 0" (0mm)
Right side 0" (0mm)
Continue to next page —>
Pre-Install Checklist (cont.)