Installation
MN-39404 • Rev 0 • 05/18 • AR-7T Series Electric Rotisserie Manual 13
Rotisserie Pre-Installation Checklist (continued)
Signoff :
Manager
Technician
PRINT SIGN
Drain (refer to graphic):
1. Is the drain located within 3 feet (914mm) of the oven?
❑
YES ❑ NO
2. If no, what is the actual distance?
3. Is the drain located directly beneath the oven?
❑
YES ❑ NO
4. Can the drain be moved?
❑
YES ❑ NO
5. Can other accomodations for the drain be made?
❑
YES ❑ NO
6. If the drain cannot be moved, or other occomodations made,
contact Alto-Shaam.
Comments:
7. Will all materials for drain plumbing be available at the time of
installation?
❑
YES ❑ NO
8. Are there any challenges for a successful installation?
❑
YES ❑ NO
If yes, explain:
Pre-Install Checklist (cont.)