EasyManua.ls Logo

Amazone Hektor - Maintenance Schedule - Overview

Amazone Hektor
66 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Cleaning, maintenance and repair
10.3 Maintenance schedule overview
Execute maintenance tasks after the first scheduled
maintenance period has been reached.
The times, running hours or maintenance intervals of any
third party documentation shall have priority.
Before each start-up
1. Check the hoses/tubes and connecting pieces for visible
defects/leaky connections.
2. Repair any areas of chafing on hoses and tubes.
3. Replace any worn or damaged hose and tubes immediately.
4. Fix leaky connections immediately.
After the first working run
Component
Servicing work
see
page
Workshop work
Hydraulic system
Check for leaks
Check for defects on the hose
lines
59
Daily
Component
Servicing work
see
page
Workshop work
Whole implement
Check for visible defects
Clean after operation, and
protect uncoated surfaces
against corrosion
Shares / other wear parts
Condition check, replace if
necessary
56
Shear bolts
Check all bolts for tightness,
replace if necessary
56
Weekly / 50 operating hours
Component
Servicing work
see
page
Workshop work
Hydraulic system
Check for leaks
Check for defects on the hose
lines
59
Support wheel
Check inflation pressure, correct
if necessary
57
Check the bearing clearance on
the wheel hubs
58
Annually / 1000 operating hours
Component
Servicing work
see
page
Workshop work
Hydraulic accumulator
Set the oil pressure
56
Hektor BAG0186.1 07.19
53

Table of Contents

Related product manuals