AM-48 Test Set (18-0015) Receiving and Unpacking
0015-S02
2-1
2. RECEIVING AND UNPACKING
2.1 Introduction
This section covers procedures to follow when the AM-48 is first
received in its shipping container:
2.2 Inspection when Received
2.3 Verification of Contents
2.2 Inspection when Received
The AM-48 was thoroughly tested and carefully packed before
shipment, and was in good condition when turned over to the carrier
for transport.
The name of the carrier will be noted on the packing slip which
accompanied the shipment.
Upon receipt, thoroughly inspect the outside of the shipping container
for damage. If the container is damaged, and the AM-48 is found to
be damaged or non-operational, immediately contact the carrier and
submit a claim for damages.
Note: To test if the unit is operational, see Section 4 for Power
Considerations and Section 5 for Self-Test Instructions.
2.3 Verification of Contents
After opening and unpacking, use the following equipment lists to
verify that all ordered items have been received. Note that some
items are standard and always included; other items are optional, and
only shipped when specially ordered.