2. Before Activating the Equipment
2.1. Damage due to Shipment
The instrument was tested before shipment and was packed carefully on a transport palette. Each box is marked with a
detailed list of the contents.
Before activating the equipment, check for damage which may have occurred during shipment. Check each container as well
as the generator itself. In case of physical damage, contact the manufacturer before operating the unit.
Figure 1 – Instrument
Figure 2 – Rack
Figure 3 - System
2.2. Power requirements
Prior to turning the equipment on, check that the selected voltage corresponds to the supply voltage.