41
6. FACP test to be carried out as follows:
Operate each alarm test, fault test, isolate and reset facility
provided for each alarm zone facility to determine correct
operaon.
Operate the primary power source switch on and o at least
ve mes to check the system will not cause a false alarm
from primary power source interrupons.
Yes No N/A
7. Detector tesng to be carried out as follows:
Test each installed detector or sampling point with an
approved in-situ tester, and ensure that each detector has
operated in the correct range, and the alarm has indicated
on the control and indicang equipment and, if applicable, at
the detector tested.
Conrm that response of the system does not exceed 6 s
from the me the detector operates unl the master alarm
facility registers the alarm (while in normal mode) on each
zone, or 32 s when AVF is ed.
Record tests on detector test record as required by the
appropriate local authority and aach to the report.
Check the operaon of each manual call point and all other actuang
devices.
9. For Flame detectors perform the following
Check that the number and type of detectors provide
adequate protecon of the area.
Check that there are no 'blind' spots in areas protected.
Check that detectors are rigidly xed.
Check that detectors are properly connected to compable
control and indicang equipment.
Check that detector lenses are clean and adequately
protected from dust and extraneous radiaon sources where
these are present.
Test the detecon response to a ame source or simulated
ame.