AT682/683 User’s Manual
10
1 Unpacking and Preparation
This chapter describes how to set up and start the AT682/683 Megohmmeter.
Incoming Inspection
Power Requirements
Setting up the Fuse
How to Remove the Handle
Environmental Requirements
Cleaning
1.1 Incoming Inspection
After you receive the instrument, carry out checks during unpacking according to the
following procedure.
If the external face of the instrument (such as the cover, front/rear panel, VFD
screen, power switch, and port connectors) appears to have been damaged during
transport, do not turn on the power switch. Otherwise, you may get an electrical
shock.
1. Check that the packing box or shock-absorbing material used to package the
instrument has not been damaged.
2. Referring to Table 1-1, check that all packaged items supplied with the meter have
been provided as per the specified optioned.
If an abnormality is detected, contact the company and transport the meter to your
nearest Applent Instruments sales or service office. For inspection by the transport
company, save the packing box, shock-absorbing material, and packaged items as you
received them.
Table 1-1 Items Packaged with the meter
Includes Product certification