EasyManua.ls Logo

APT WorldCast Equinox - 2.4. Unpacking and Inspection

APT WorldCast Equinox
170 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
WorldCast Equinox - Release 3.1 - user manual 07/2011
Page 14
Whiterock Business Park - 729 Springfield Road - Belfast BT12 7FP - Northern Ireland
Tel.: +44 28 9067 7200 | Fax: +44 28 9067 7201 | http://www.aptcodecs.com | contact@aptcodecs.com
2.4. Unpacking and Inspection
After unpacking:
Check the unit for damage during shipping. Immediately report any damage back to the distribu-
tor or APT.
Check that the list of contents is complete as follows:
WorldCast Equinox Unit
Power Supplies
Please confirm that the local power supply voltage matches the required voltage levels 100-
240V a.c.
Cables
A power cable will be supplied with the unit together with any other special cables as ordered.
CD box
A CD box including a Quick Start guide and a CD where you will find the documentation for this
product and the Codec Management System or the Network Management System application.
If the equipment supplied does not match the items requested please contact APT or your local dis-
tributor immediately and report any shortages. Please do not connect the system to the telecom net-
work or apply power to the unit if you are in any doubt about the contents as this could lead to dam-
age of the hardware.
Detailed information for installation and wiring is provided in section 4 Installation and Wiring of this
manual.

Table of Contents