EasyManua.ls Logo

Bernette b70 DECO - Page 29

Bernette b70 DECO
97 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Embroidering preparation
28
2019-02 EN 5020070.00A.04
> Place the thread spool on the spool holder so that the thread unwinds clockwise.
> Add the appropriate spool disc.
> Guide the thread from the spool through the upper thread guide (2).
> Guide the thread from the spool through the upper thread guide (3).
> Place the thread end downwards along the duct.
> Then, down and around the check spring holder.

Table of Contents

Related product manuals