EasyManua.ls Logo

BIFFI IMVS2000v2 - Page 48

BIFFI IMVS2000v2
110 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
September 2019
Installation, Operation and Maintenance Manual
MAN720_IMVS2000v2_IOM Rev. 6
MAN720_IMVS2000v2_IOM Rev. 6
Section 6: Conguration Parameters
Conguration Parameters
PARAMETERS OF THE “VIEW/SETUP MODE” MENU
PARAMETER NAME DESCRIPTION RANGE
DEFAULT
VALUE
R/W
(1)
AVAILABLE
ON (2) (3)
Op. Max. T.
(Opening Maximum
Time)
It determines the “duration” of the graph of the
opening FST.
It is set by default at the same value of “Op. Cal.
T.” any time that a “Calibration” is performed
and that the “Op. Time %” parameter is set.
See Section 5.2.8 for details.
This parameter must be modified only if strictly
necessary by expert users. It can affect the
operating mode of the device.
1.7–2000 sec
Op. Cal.
Time
R/W
Local, Serial,
Bus
Cl. Cal. T.
(Closing Calculated
Time)
It is the calculated time for the Closing FST
graphs.See Section 5.2.8 for details.
1.7–2000 sec R
Local, Serial,
Bus
Cl. Max. T.
(Closing Maximum
Time)
It determines the “duration” of the graph of the
closing FST. It is set by default at the same value
of “Cl. Cal. Time” any time that a “Calibration” is
performed and that the “Cl. Time %” parameter
is set. See Section 5.2.8 for details.
This parameter must be modied only if strictly
necessary by expert users. It can affect the
operating mode of the device.
1.7–2000 sec
Cl. Cal.
Time
R/W
Local, Serial,
Bus
Base. S. St.
(Baseline Signature
Status)
It is the status of the last Baseline Signature.
“Not Done”: no Baseline Signature is performed
yet. “Progress”: during the execution of a
Baseline Signature. “Failed”: some errors occur
during the last Baseline Signature. “Passed”:
Baseline Signature successfully performed.
“Conf_Err”: the command is not performed
due to wrong conguration or “Pos. Req” not
aligned with “Position” or if the command is not
available (“Signatures En.” or “Cal. Status”) or
“Op. Max time” = 0 or “Cl. Max Time” = 0, CAL
or POS alarms active, etc.
“Failed” is squelched by “Conf. Err.”
It is set to “Not Done” after every Calibration.
Not Done,
Passed,
Failed,
Progress
Conf_Err
Not Done R
Local, Serial,
Bus
B.S. Date
(Baseline Signature
Time)
It is the date of the last performed Baseline
Signature. It is set to “01-01-2014” after every
Calibration.
01-01-2014
31-12-2099
01-01-
2014
R
Local, Serial,
Bus
B.S. Time
(Baseline Signature
Date)
It is the time of the last performed Baseline
Signature.
It is set to “08.00” after every Calibration.
00.00 – 23.59 08.00 R
Local, Serial,
Bus
Op. Status
(Opening Status)
It is the status of the last opening FST.
It is “Not Done” if no Opening FST is performed
yet. It is “Failed” if at least one of the following
alarms is generated during the last Opening
FST: SOBT, FOBT, SOTT, FOTT, OHBP, OLBP,
OPNM and OPCT. Otherwise it is “Passed.
See Section 8 for details.
It is set to “Not Done” after every Calibration or
Baseline Sign.
Not Done,
Passed,
Failed.
Not Done R
Local, Serial,
Bus
44

Table of Contents

Related product manuals