EP600 Battery Energy Storage System User Manual
Project installation location
Size of drilling the wall mounting holes (unit: mm):
Figure 5-5
Remarks: For system installation, a maximum of 5 layers of Energy Storage System (include
inverter) are stacked on the base. Each time a battery pack is added or removed, one group of
mounting holes will be added or reduced accordingly, and the distance between adjacent battery
packs is 325mm (combined with practical operations).
5.5 installation tools
Prepare the tools needed for installation and electrical connections.