EP600 Energy Storage System User Manual
any conduct’s surface or metal terminal;
After the Energy Storage System is installed, please clean out the package material promptly, such as
cartons, foam, plastics, nylon ties, etc;
Except the operator, please keep other people away from the Energy Storage System;
Please use original package or other material to packing the Energy Storage System for shockproof
protection when moving;
All ports of the Energy Storage System must be sealed, and according the requirement to install the machine;
Forbid to alter ,damage or cover the identification and nameplate of Energy Storage System;
Please use the suitable tool to lock the screws tightly when installing the Energy Storage System;
Please fix the Energy Storage System on the group or other stable object(such as the wall or the frame ) before
operating;
Forbid to use water to clean the Energy Storage System or any electronic components;
Forbid to arbitrarily change or modify the structure、the order of install, etc.
1.2.1 Requirement of installation and maintenance personnel
EP600 energy storage system installation、electrical connection, test, maintenance, troubleshooting
and replace operation must be operated by professional electrical technician. EP600.
The installation and maintenance personnel must have received professional training, have clear knowledge
about the Energy Storage System safety instruction and master the correct operation.
Professional personnel: Personnel who have received correspond technical training can clearly realize what risk may
be brought to them during the operation, and able to take measure promptly to minimize the personal risk.
Energy Storage System or components (include software) must be replaced by professionals or authorized
personnel.
1.2.2 Requirement of anti-static
When installing the cables, it is recommended to wear anti-static glove or anti-static bracelet before contacting the
Energy Storage System. The other side of anti-static Bracelet should be grounded properly. Don't touch any exposed
components directly with your hand.
1.2.3 Precaution of drilling
When drill on the wall or ground , the following safety protection measures should be considered;
Forbid to drill on the Energy Storage System. Drilling will damage the Energy Storage System’s appearance,
internal components and cable insulation. In addition, if metal debris enters the internal of Energy Storage
System , it will cause internal circuit board short circuit;
Wear goggles and protective gloves when drilling;
In the process of drilling, the power station should be covered and protected incase of the debris or dust
drop intothe power station. The debris and dust should be cleaned out promptly after drilling.
1.3
Precaution of electrical connection
The EP600 energy storage system will generate high voltage during operating, which may cause
casualties, personal injury or serious damage to property. Please comply with relevant safety
regulations during the installation
、
trial run
、
operation and maintenance of the product.